TSN summary estimate calculation for technological connection. Prices by type of work with explanation. calculate the cost of budgeting services

Our team will draw up estimates for any type of work, using all current and expired government regulations, including commercial rates, namely:

  • Draw up an estimate in FER-2001, all editions - 2003, 2008, 2009, 2014, 2017, taking into account additions and changes;
  • Draw up an estimate in TER-2001, of any region of the Russian Federation, in all editions, operating and not operating;
  • Draw up an estimate in TSN-2001 for Moscow for two developers, both GAU "Mosgosexpertiza" and MCTS "Mosstroytseny", and if necessary, even in MTSN 81-98;
  • Draw up estimates in the SN-2012, all editions - 2015, 2016, 2017 and 2018, taking into account additions and changes in force for budget formation, previous editions for mutual settlements with customers and for reports to regulatory authorities;
  • Prepare estimates using the resource method based on the data provided and according to the data posted in the FSIS CS system - the Federal State Pricing System in Construction;
  • Prepare estimates in commercial prices based on the provided data, price lists of manufacturers and participate in the formation of a package of documentation.

We can:

  • Draw up an estimate for construction work (building construction, house construction), for repair work (building renovation, house renovation, apartment renovation), for installation and commissioning work, maintenance and landscaping;
  • Draw up an estimate for design and survey work using state collections of basic prices (SBC) and collections of the unified regulatory framework of the Moscow Regional Recommendations (MRR);
  • Check the estimate documentation and issue your opinion on the correctness of the application of prices, correct errors if necessary.

We will analyze the task, select the best option for mutual settlements, and complete the task in the shortest possible time.

Order an estimate

Where can I order an estimate, and also order it inexpensively? The issue is delicate, due to the fact that supply exceeds demand and often the search and selection of a contractor takes a lot of time. If you are reading these lines, it means you have found an elementary solution for yourself.

How much does it cost to create an estimate?

In determining the cost of our services, we rely on the ability to bring the ratio of inexpensive and high quality as close as possible. Considering this fact, when asked how much it costs to make an estimate, we will answer - let's negotiate!

  • If you need a little advice and we have it in our templates, it won’t be difficult for us to give it to you just like that!
  • If you need estimates for part or the entire project, the execution of work must be supported by acts of KS-2, certificates of KS-3, and a log of the implementation of KS-6 is required, then we will negotiate here.

To do this, call or write to us via chat.

The cost of preparing estimate documentation directly depends on the following points:

  1. initial data;
  2. turnaround time;
  3. list of participants;
  4. the final result.

In cases where you do not have the opportunity to provide the necessary volumes for the preparation of estimate documentation, our employees can go to the site and make all the necessary measurements, draw up a technical specification or work statement.

We can also offer estimate outsourcing. This service is beneficial for large and small organizations. The manager does not need to maintain an estimate department or even one estimate employee. You can contact us at the right time. When ordering services from us, you can be sure that all work will be completed efficiently and on time.

Call or write, place an order and you will be satisfied with our work!

Two ways

calculate the cost of budgeting services

1. Method one

Type of work Units price, rub.
Drawing up local estimates for any types of construction and installation work according to the bill of quantities, defective list, list of works with volumes. position 100
Calculation of physical volumes for the project (if the data is not provided in the form of a statement of quantities) position 150-200
Drawing up estimates for design and survey work estimate from 3000
Checking the design and survey estimate and providing a conclusion estimate 5000
Checking the construction and installation work estimate and providing a conclusion position 100
Incorporation of estimates into the estimate program position 70
Restoration of the estimate according to the KS-6 form position 90
Drawing up KS-2 according to the Customer’s estimate position 70
Measurements of the object (internal) with subsequent preparation of technical data. assignments or defect lists 1 hour 1500
Departure of an estimator (up to 3 hours) 1 trip 3500

An estimate item means a line in the estimate document with the price of work, or the price of material, or a line in the KS-2-3 act. If you need the services of an estimator, or you have a question, you can leave an online application right now and make sure that you can make an estimate with us quickly and profitably!

2. Second method

There are design solutions, but there is no certainty about the number of possible positions in the future estimate. The price is formed as a percentage of the cost of the object or work performed.

TSN are used to determine the estimated cost of new facilities, reconstruction, and technological re-equipment directly for the city of Moscow. The preparation of TSN estimates is similar to other programs and has the same methodology for calculating the volume of work in prices. How to read the estimate according to the prices of TSN in Moscow?

The title is filled in according to the Contract Agreement:

  • I affirm
  • Agreed,
  • Base,
  • Compiled as of...

Decoding the TSN estimate. The main table with data consists of 10-11 columns:

  • No. - number in order;
  • Pricing code and resource codes (rationale for the coefficient) - used from ready-made estimate collections;
  • Name of work and costs - explanation of the code with a detailed description of the type of work;
  • Unit. - natural value corresponding to the meter;
  • Quantity - according to the project or bill of quantities;
  • Price per unit, rub - base price according to TSN of Moscow 2001 without VAT;
  • Correction coefficients - if there is crowding at the site, the base price is adjusted by a special coefficient taking into account the special working conditions of the personnel;
  • Winter price increase coefficient - if the work is carried out during the cold period;
  • Conversion factor - inflation index to the estimated prices of TSN into current prices (added from the monthly calculation for cost items);
  • Total costs, rubles - multiplication of columns: 5,6,7,8,9 - this is the current price at the time of drawing up the estimate with the current translation index;
  • When reading the estimate of TSN of Moscow, you should take into account that there is work and materials. Additionally, the overhead costs of HP and the estimated profit of the joint venture are accrued from the wages of the main workers of the industrial plant, and HP and joint venture from the salaries of the plant operators. Their value is fixed as a percentage for each type of work. This is clearly visible under the name of each price.
  • ZTR is the labor costs of workers per person hour;
  • “Supplier price” - this wording means that the price is included in the estimate according to the invoice, price list, commercial proposal (which must be attached for the Customer to check the set) without VAT (VAT is charged separately at the very end of the document, so initially it is removed from the unit cost ). The Customer does not always allow such a price to be accepted, because... in the collections of estimated prices there are ready-made items with such materials.

We read the results of the TSN estimate:

  • For each section, the results of the TSN collections are summed up (you need to read from top to bottom);
  • The results of the estimate of TSN of Moscow are read similarly to the results of the sections, having previously summed them up.

Estimated regulatory framework TSN 2001 is a database of estimated standards and prices for the application and calculation of the estimated cost of construction on construction projects financed from the budget of the city of Moscow.

The database is distributed both in paper form as collections of books, and electronically as an appendix to budget programs.

TSN 2001 for the city of Moscow

Territorial estimate standards for the city of Moscow at the basic price level as of January 1, 2000 were developed in accordance with the Moscow Government Decree of August 10, 2004 No. 557-PP “On improving the territorial estimate and normative base for determining the cost of construction of facilities in the city of Moscow” .

TSN 2001 was put into effect in accordance with the Moscow Government Decree No. 900-PP dated November 14, 2006 “On the procedure for transition to determining the estimated cost of construction of facilities in the city of Moscow using territorial estimated standards in the price level as of January 1, 2000” in in order to implement an organized transition to a unified system in the Russian Federation for drawing up estimate documentation for city government orders.

The powers of the owner of the TSN 2001 estimate and regulatory framework in force on the territory of the city of Moscow are exercised by the Moscow City Committee for Pricing Policy in Construction and State Expertise of Projects (Moskomekspertiza) in accordance with Moscow Government Resolution No. 48-PP dated February 24, 2011 “On approval of the regulations on Moscow City Committee on Pricing Policy in Construction and State Expertise of Projects."

Collections of standards TSN 2001 are intended for the development of estimate documentation and determination of the estimated cost of construction (reconstruction, major repairs) and restoration and restoration work on objects of state order of the city of Moscow, development of aggregated indicators of the cost of objects, types and complexes of work performed in construction, determination of the initial ( maximum) contract price and contract price concluded with a single supplier.

In the estimated standards of TSN 2001, the level of remuneration of workers in construction, prices and tariffs for material and technical resources and services are adopted according to the state recorded in the investment and construction sector of Moscow as of January 1, 2000.

The estimated standards of TSN 2001 take into account the full range of operations necessary to perform a certain type or set of work in the average prevailing conditions of the existing urban development. The norms and prices compiled on their basis for building structures and work, norms and prices for repair and construction work and equipment installation work, demolition or dismantling of buildings and structures are averaged both according to the conditions of the work sites and the contents contained therein. standard indicators of resource consumption.

Estimated standards and prices provide for the work to be carried out under normal conditions, not complicated by external factors. When carrying out work in special conditions: cramped conditions, gas pollution, near operating equipment, etc., the coefficients given in the general provisions for the chapters and technical parts of the relevant collections of estimate norms and prices should be applied to the estimated standards and prices.

If the current collections of estimate standards and prices do not contain separate standards for the work technologies provided for in the design documentation, in exceptional cases it is allowed, in agreement with Moskomekspertiza, to develop appropriate calculations of the estimated cost of work and resources, which are approved by the customer as part of the design documentation. Development and application of individual estimate standards intended for the construction of a specific facility according to the work production technologies provided for in the design documentation, working conditions and supply of resources that are absent or different from the technologies taken into account in the estimate standards contained in the territorial estimate and regulatory framework for the city of Moscow TSN 2001 , carried out by decision of the Moscow Government.

Prices and equipment

Buy TSN 2001

To purchase the estimated regulatory framework for territorial estimated standards for the city of Moscow in the current edition, just send us your contact information by clicking the Buy button in the page header. We will contact you, agree on the package, delivery and payment options, and then, as soon as possible, we will ensure the launch of the database at your workplace.

Price TSN 2001

The price of SNB TSN 2001 varies from 5,000 to 12,000 rubles. depending on the number of jobs. To establish a regulatory framework, we recommend using the services of On-Site or Remote Support specialists, in order to avoid wasting time, including setting up parameters for the correct operation of the estimate database in the estimate program.

Price

complete with estimate program Smeta.RU

Due to the fact that the regulatory framework of TSN 2001 is applied on a territorial basis in Moscow, it seems possible to use it as part of the program Smeta.Region. This significantly saves funds on purchases, but only in cases of drawing up estimate documentation for the Moscow region. In cases of working with several regions, you should buy Smeta.RU. Our consultants will tell you more about the difference between the programs.

Installation and training - free

When purchasing the TSN 2001 regulatory framework along with the program, we will bring you a complete license package for the program and base, install it on your computer and provide training on how to use it within 3 hours.

Estimate program Quantity
work places
Price
programs
Price
TSN 2001
Price
supplies
Smeta.RU From 1 to 5 25,000 rub. 12,000 rub. 37,000 rub.
Over 5 20,000 rub. 8,000 rub. 28,000 rub.
Over 15 15,000 rub. 5,000 rub. 20,000 rub.
Smeta.Region From 1 to 5 15,000 rub. 12,000 rub. 27,000 rub.
Smeta.RU For
- individuals
From 1 to 5 15,000 rub. 12,000 rub. 27,000 rub.

To install the regulatory framework into the program, we strongly recommend that you contact specialists who will save your time for a small fee.

Territorial estimate and regulatory framework of the city of Moscow

  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 54, 10/30/2019
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 53, 04/23/2019
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 52, 04/23/2019
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 51, 01/21/2019
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 50, 10/16/2018
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 49, 07/25/2018
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 48, 04/11/2018
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 47, 02.19.2018
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 46, 03.11.2017
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 45, 08/11/2017
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 44, 05/10/2017
  • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow - No. 43, 02.27.2017
  • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 53, 04/25/2019
  • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 52, 04/25/2019
  • (MCCS) JSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 51, 01/30/2019
  • (MCCS) JSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 50, 11/12/2018
  • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 48, 04/24/2018
  • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 47, 02.19.2018
  • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 46, 11/24/2017
  • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 45, 08/23/2017
  • (MCCS) JSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 44, 06/30/2017
  • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow - No. 43, 02.02.2017

Download TSN 2001 in PDF format

SNB TSN 2001 in PDF format is convenient for informational purposes or for negotiating prices.

  • TSN 2001 MGE - State institution of the city of Moscow "Moscow State Expertise"
    • (MGE) State Autonomous Institution "Mosgosexpertiza" - TSN-2001 Moscow
      • History of development
  • TSN 2001 MCTS - Moscow Center for Pricing in Construction "Mosstroytsena"
    • (MCCS) OJSC MCCS "Mosstroytseny" - TSN-2001 Moscow
      • History of development

History of development

Order No. MKE-OD/19-92 dated December 30, 2019

Overhead and estimated profit standards were approved and put into effect.

Overhead costs and estimated profits, calculated from the wages of workers employed in the main production, should be taken according to the standards put into effect and approved by the Moscow City Committee on pricing policy in construction and state examination of projects, Order No. MKE-OD/19-92 dated 12/30/2019 On approval of overhead costs and estimated profits for 2020.

  • Overhead costs from the wages of drivers are 93%;
  • The estimated profit on machinists' wages is 64%.

Table of overhead costs and estimated profit for 2020

1. Construction and installation work

p.p.
Types of construction and installation work Overheads Estimated profit
1.01 Excavation work performed: mechanized 92 50
1.02 Excavation work performed: manually 85 41
2 Drilling and blasting operations 116 55
3 Pile work 119 75
4 Consolidation of soils, sinkholes 68 54
5 92 65
6 Prefabricated concrete and reinforced concrete structures 124 56
7.01 A set of works for the installation of structures of large-panel residential buildings erected by DSK: zero cycle, underground part 124 59
7.02 A set of works for the installation of structures of large-panel residential buildings erected by DSK: above-ground part 131 89
8 92 41
9 Metal constructions 70 50
10 Wooden structures 87 41
11 Floors 87 41
12 Roofs 87 41
13 85 41
14 Structures in rural construction (construction of greenhouses) 85 41
15 Finishing works (painting, plastering, glass, tiling, wallpaper, stucco) 88 42
16 Internal sanitary work (pipelines, water supply, sewerage, heating, gas supply, ventilation and air conditioning) 100 45
17 External networks of water supply, sewerage, heat supply, gas pipelines 106 53
18 Thermal insulation work 79 41
19 Car roads 131 54
19.1 Sidewalks, paths and playgrounds 106 41
20 Railways 96 59
21 Bridges, pipes and overpasses 94 64
22 City transport tunnels and underground passages 104 41
23.1 Metro: closed way of working 122 51
23.2 Metropolitan: open way of working 105 44
24 Power lines 92 41
25 Communications facilities 90 41
26 Laying and installation of communication networks 90 41
27 Installation of radio and television equipment 90 41
28 Bank protection works, hydraulic structures 90 54
29 Industrial furnaces, pipes 88 63
30 landscaping 102 47
31 Installation of equipment 68 43
31.1 Installation of electrical installations 90 43
32 Commissioning works 68 41
33 Other construction work 85 41
Read Addendum No. 54 to TSN-2001 for Moscow

Addendum No. 53 to NB TSN-2001

Order No. MKE-OD/19-44 dated July 12, 2019

Addition No. 53 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect in June 2019, by order No. MKE-OD/19-44 dated July 12, 2019 “On approval and entry into force of the Collection of additions No. 53 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 ".

ADDITIONS

  • Section 3. Semi-finished products
  • Section 9. Products made of wood and plastic profiles.
  • Section 14. Materials and products for communication structures, radio broadcasting and television
  • Section 15. Pumps
  • Section 23. Cable products
Chapter 3. Construction work
  • Collection 5.
    • Department 1. Piling works
  • Collection 13. Protection of building structures and equipment from corrosion
    • Section 2. Paint and varnish protective coatings
  • Collection 15. Finishing work
    • Department 1. Cladding works
      • Section 10. Cladding with decorative finishing panels
    • Department 2. Plastering works
      • Section 3. Plastering surfaces inside buildings
    • Department 4. Painting works
      • Section 3. Painting with polyvinyl acetate, water-based and water-dispersion compositions
      • Section 5. Coating and painting with varnishes and special compounds, fire protection of metal structures
  • Collection 16. Internal pipelines
    • Section 13. Other work
  • Collection 27. Car roads
    • Section 25. Construction of seams
Chapter 4. Installation of equipment
  • Collection 8. Electrical installations
    • Department 1. Switchgears and substations
      • Section 1. Open switchgears 6-750 kV
  • Collection 31. Repair of works of monumental and decorative art made of metals and stones located in the open air
Regulatory table
CHANGES
  • Chapter 1. Average estimated prices for materials, products and structures
  • Chapter 2. Estimated prices for the operation of construction machines
  • Chapter 3. Construction work
  • Chapter 4. Installation of equipment
  • Chapter 7. Restoration and restoration work on historical and cultural monuments
DELETIONS
    • Section 1. Construction materials, road materials and for restoration work
    • Section 7. Metal products
    • Section 13. Valves (for pipelines and water supply)
    • Section 1. Construction machines, mechanisms and tools
    • Section 2. Cost of relocation of construction machinery and mechanisms
    • Section 3. Relocation of additional sections
  • Chapter 3. Construction work
    • Collection 29. Tunnels and subways
        Department 1. Closed method of work
        • Section 7. Waterproofing device

Order No. MKE-OD/19-36 dated June 20, 2019

Reserve funds for unforeseen expenses

The Moscow City Committee on Pricing Policy in Construction and State Expertise of Projects, by order No. MKE-OD/19-36 dated June 20, 2019, made changes to the general guidelines for the use of TSN-2001.

The consolidated estimate includes a reserve of funds for unforeseen work and costs, intended to reimburse the cost of work and expenses, the need for which arises in the process of developing working documentation or during construction as a result of clarifying design decisions or construction conditions in relation to objects (performing types of work) provided for in the approved project.

The fund reserve for unforeseen work and costs is determined:
  • during the construction and reconstruction of capital construction projects - based on the total amount of calculations provided for in Chapters 1-12 of the consolidated construction estimate;
  • during major repairs of capital construction projects - based on the total amount of calculations provided for in Chapters 1-9 of the specified consolidated estimate.

In relation to capital construction projects, the construction, reconstruction or major repairs of which are carried out with the involvement of funds from the budget of the city of Moscow, the reserve of funds for unforeseen work and costs is determined by the state customer in agreement with the main manager of the funds of the corresponding budget (except for cases when the state customer is the main manager funds) within the limits not exceeding:

  • a) 2 percent - for capital construction projects for non-production purposes;
  • 6) 3 percent - for capital construction projects for industrial purposes;
  • c) 10 percent - for unique capital construction projects, as well as metro facilities (except for work in the preparatory period).
When is Smeta.RU?

These changes will be included in addition 53 to the TSN-2001 database, which is being prepared for release.

Addendum No. 52 to NB TSN-2001

Order No. MKE-OD/19-25 dated April 15, 2019

Addition No. 52 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect in April 2019, by order No. MKE-OD/19-25 dated April 15, 2019 “On approval and entry into force of the Collection of additions No. 52 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 ".

List of additions and changes:

ADDITIONS
Chapter 1. Average estimated prices for materials, products and structures
  • 1.3. Waterproofing and roofing materials

Section 3. Semi-finished products


  • 5. Hardware and fasteners
  • 9. Flanges

Section 13. Valves (for pipelines and water supply)

  • 3. General purpose valves
  • 4. General purpose cranes

    • Section 18. Materials and products for heat supply systems
      • 3. Boiler equipment
      • 4. Heating devices
      • Chapter 2. Estimated prices for the operation of construction machines
        • 17. Other machines

        Section 2. Relocation of construction machinery and mechanisms
        • 17. Other machines
        Chapter 3. Construction work
        • Collection 9. Metal constructions
          • Department 3. Assembly and installation of individual structural elements made of aluminum alloys
            • Section 3. Window and door blocks, stained glass
              • Table 9-83. Installation of window blocks made of aluminum profiles in residential and public buildings
        • Collection 15. Finishing work
            • Section 10. Cladding with decorative finishing panels
              • Table 15-174. Installation of a system for protecting walls and corners (fender boards, fender rails, corner fenders)

        • Collection 27. Car roads
          • Section 22. Additional work
          Collection 12 . Roofs
          • Table 27-124. Creation of sites for high loads using geotechnical biaxial grid
          • Table 27-125. Soil stabilization using geotechnical biaxial grid
        Chapter 6. Repair and construction work
        • Collection 68. Improvement
          • Department 4. Miscellaneous works during landscaping
            • Table 68-89. Mechanical dewatering of water treatment wash water sludge and sludge deposits
        • Collection 69 .
          • Section 7. Miscellaneous repair and construction work
            • Table 69-64. Dismantling of monolithic reinforced concrete structures with a hydraulic hammer based on an excavator
            • Table 69-65. Dismantling of concrete and reinforced concrete structures with a volume of more than 1 m3 using jackhammers

            Chapter 7. Restoration and restoration work on historical and cultural monuments
            • Collection 31. Repair of works of monumental and decorative art made of metals and stones located in the open air
              • Department 1. Works of monumental and decorative art made of metals and alloys
                • Table 31-9. Cleaning the surfaces of works of monumental and decorative art made of metals and alloys from corrosion products
              • Department 2. Works of monumental and decorative art made of stone
                • Table 31-6. Conservation treatment of the surface of works of monumental and decorative art made of stone
                • Table 31-7. Cleaning the surface of works of monumental and decorative art made of stone from old mastics, concrete deposits, and traces of mortars
                • Table 31-8. Clearing traces of ferrugination from the surface of works of monumental and decorative art made of stone
                • Table 31-10. Sealing interblock seams
                • Table 31-12. Clearing interblock seams
              • Department 3. Other work
                • Table 31-11. Covering the surface of works of monumental and decorative art with plastic film
            Regulatory table
            CHANGES
            • Chapter 1. Average estimated prices for materials, products and structures
            • Chapter 3. Construction work
            • Chapter 6. Repair and construction work
            • Chapter 7. Restoration and restoration work on historical and cultural monuments
            DELETIONS
            • Chapter 1. Average estimated prices for materials, products and structures
              • Section 1. Construction materials, road materials and for restoration work
                • 1.13. Material resources not included in the above groups 1.1-1.12
            • Chapter 2. Estimated prices for the operation of construction machines
              • Section 1. Construction machines, mechanisms and tools
            • Chapter 14. Maintenance and repair of municipal equipment
              • Collection 11. Maintenance and repair of measuring equipment, equipment and pipeline systems at water supply and sewerage facilities
                • Department 2. Maintenance and repair of equipment and pipeline systems
                  • Section 4. Maintenance

Addendum No. 51 to NB TSN-2001

Order No. MKE-OD/19-2 dated January 15, 2019

Addendum No. 51 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect in January 2019, by order No. MKE-OD/19-2 dated January 15, 2019 “On approval and entry into force of the Collection of additions No. 51 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 ".

List of additions and changes:

ADDITIONS
Chapter 1. Average estimated prices for materials, products and structures
Section 1. Average estimated prices for materials, products and structures

  • 1.1. Bitumen, sealants, mastics, resins
  • 1.3. Sanitary operation
  • 1.6. Paint and varnish, anti-corrosion, antiseptic, fire retardant materials
  • 1.9. Hardware and fasteners
  • 1.13. Material resources not included in the above groups 1.1-1.12
  • 2. Material resources used in restoration work
Section 3. Semi-finished products
  • 2. Commercial solutions, dry mixtures for solutions and lime milk (dough)
Section 5. Reinforced concrete and concrete products
  • 4. Products for housing and civil construction
Section 7. Metal products
  • 5. Hardware and fasteners
Section 12. Pipe blanks, pipes, connecting parts and fastenings to them
  • 10. Fastening means and connecting parts
  • 1. Incomplete steel electrical structures
Section 23. Cable products
  • 1. Control cables
  • 2. Power cables for non-stationary installation
  • 3. Communication cables
  • 4. Telephone cables
  • 5. Cables for radio broadcasting and television
  • 6. Control, alarm and interlock cables
  • 7. Power cables with aluminum conductors
  • 8. Power cables with copper conductors
  • 9. Installation cables
  • 10. Bare wires
  • 13. General purpose installation wires
  • 18. Power cables with conductors made of aluminum alloys
Chapter 2. Estimated prices for the operation of construction machines
Section 1.
  • 17. Other machines
  • 30. Mechanized tools, machines
Chapter 3. Construction work
  • Collection 7.
    • Division 2. Structures of residential and public buildings and administrative buildings of industrial enterprises with the largest mass of mounted elements of the above-ground part up to 10 tons or building height up to 48 m
      • Section 7. Exterior wall panels
        • Table 7-27. Installation of panels
      • Section 6. Exterior wall panels
        • Table 7-37. Installation of panels
  • Collection 8. Brick and block structures
      • Table 8-48. Coating lateral waterproofing of walls and foundations with polymer mastic based on butyl rubber
  • Collection 12. Roofs
    • Table 12-45. Installation of flat roofs from EPDM membrane on a finished base
    • Table 12-46. Connection device made of EPDM membrane
  • Collection 15. Finishing work
    • Department 1. Cladding works
      • Section 13. Installation of suspended ventilated facades<
        • Table 15-178. Installation of a ventilated façade covered with porcelain stoneware slabs on a hanging system made of galvanized steel, with cradles
  • Collection 27. Car roads
    • Section 8. Side stones
      • Table 27-123. Cutting side stones
  • Collection 33. Power lines
    • Department 3. Supports for contact networks of urban electric transport and urban outdoor lighting
      • Section 2. Urban outdoor lighting supports
        • Table 33-39. Installation of composite flange poles for outdoor lighting
Chapter 6. Repair and construction work
Collection 66. External engineering networks
  • Department 1. Plumbing
    • Section 2. Repair
      • Table 66-217. Restoration of pipelines using cement-polymer compositions using the centrifugal spray method
  • Department 2. Sewerage
    • Section 2. Repair
      • Table 66-220. Restoration of the surfaces of brick wells of drainage systems using cement-polymer compositions using the centrifugal spray method
  • Collection 69. Other repair and construction work
      • Table 69-63. Strengthening reinforced concrete structures with composite materials based on unidirectional carbon fibers
Chapter 7. Restoration and restoration work on historical and cultural monuments
Collection 31. Repair of works of monumental and decorative art made of metals and stones located in the open air
  • Department 1. Works of monumental and decorative art made of metals and alloys
    • Table 31-1. Washing the surfaces of works of monumental and decorative art made of metals and alloys with water and detergents
    • Table 31-4. Cleaning the surfaces of works of monumental and decorative art made of metals and alloys from paint and varnish stains
  • Department 2. Works of monumental and decorative art made of stone
    • Table 31-2. Washing the surfaces of works of monumental and decorative art made of stone with water and detergents
    • Table 31-3. Cleaning the surfaces of works of monumental and decorative art from stone from paint and varnish stains
    • Table 31-5. Dry cleaning of the surface of works of monumental and decorative art made of stone by hand
Regulatory table
CHANGES
  • Chapter 1. Average estimated prices for materials, products and structures
  • Chapter 3. Construction work
  • Chapter 6. Repair and construction work
  • Chapter 7. Restoration and restoration work on historical and cultural monuments
DELETIONS
  • Chapter 1. Average estimated prices for materials, products and structures
  • Section 4. Materials for gardening and green construction
  1. 6. Other materials
  • Section 7. Metal products
    • 3. Crane tracks, tools
    • 7. Equipment and inventory of various sites
  • Section 20. Materials and products for gas supply systems
    • 1. Gas appliances
  • Section 21. Installation and electrical installation materials and products, electrical structures
    • 4. Complete distribution, power, lighting devices
  • Chapter 6. Repair and construction work
      • Department 5. Miscellaneous works
Additions and changes to the general and technical parts of TSN-2001

Addendum No. 50 to NB TSN-2001

Order No. MKE-OD/18-46 dated 10/04/2018

Addition No. 50 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect in October 2018, by order No. MKE-OD/18-46 dated October 4, 2018 “On approval and entry into force of the Collection of additions No. 50 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 ".

ADDITIONS
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1. Construction materials, road materials and for restoration work
  • Section 6. Metal structures
  • Section 7. Metal products
  • Section 21. Installation and electrical installation materials and products, electrical structures
  • Section 23. Cable products
Chapter 2. Estimated prices for the operation of construction machines
  • Section 1. Construction machines, mechanisms and tools
Chapter 3. Construction work
  • Collection 6. Concrete, reinforced concrete monolithic structures
    • Department 1. Monolithic concrete and reinforced concrete structures using wooden panel formwork
      • Section 15. Brickwork during the construction of buildings made of monolithic reinforced concrete
  • Collection 8. Brick and block structures
      • Section 2. Brick structures
  • Collection 11. Floors
  • Collection 12. Roofs
  • Collection 13. Protection of building structures and equipment from corrosion
      • Section 9. Miscellaneous work
  • Collection 27. Car roads
      • Section 8. Side stones
      • Section 25. Construction of seams
Chapter 6. Repair and construction work
  • Collection 58. Roofs, roofs
      • Section 2. Repair
  • Collection 66. External engineering networks
    • Department 5. Miscellaneous works
  • Collection 69. Other repair and construction work
Regulatory table
CHANGES
  • Chapter 1. Average estimated prices for materials, products and structures
  • Chapter 2. Estimated prices for the operation of construction machines
  • Chapter 3. Construction work
  • Chapter 6. Repair and construction work
  • Chapter 14. Maintenance and repair of municipal equipment
DELETIONS
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1. Construction materials, road materials and for restoration work
  • Section 21. Installation and electrical installation materials and products, electrical structures
  • Section 22. Fittings, glass and electric lighting devices
  • Section 23. Cable products
Additions and changes to the general and technical parts of TSN-2001

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.


Addendum No. 49 to NB TSN-2001

Order No. MKE-OD/18-33 dated July 12, 2018

Addition No. 49 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect in July 2018, by order No. MKE-OD/18-33 dated July 12, 2018 “On approval and entry into force of the Collection of additions No. 49 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 ".

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.

List of chapters affected by changes:

ADDITIONS
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1. Construction materials, road materials and for restoration work
  • Section 3. Semi-finished products
  • Section 5. Reinforced concrete and concrete products
  • Section 7. Metal products
  • Section 12. Pipe blanks, pipes, connecting parts and fastenings to them
Chapter 2. Estimated prices for the operation of construction machines
  • Section 1. Construction machines, mechanisms and tools
Chapter 3. Construction work
  • Collection 6. Concrete, reinforced concrete monolithic structures
    • Department 4. Construction of monolithic structures of residential and public buildings using various types of adjustable formwork
      • Section 2. Other work
  • Collection 7. Prefabricated concrete and reinforced concrete structures
    • Division 2. Designs of residential and public buildings and administrative buildings of industrial enterprises with the largest mass of those installed
      • Section 7. Exterior wall panels
    • Division 3. Structures of the above-ground part of residential and public buildings and administrative buildings of industrial enterprises with the largest mass of mounted elements more than 10 tons or a building height of more than 48 m to 70 m
      • Section 6. Exterior wall panels
  • Collection 12. Roofs
  • Collection 15. Finishing work
    • Department 1. Cladding works
      • Section 13. Installation of suspended ventilated facades
  • Collection 23. Sewerage - external networks
  • Collection 34. Communications, radio and television facilities
    • Department 2. Wired communication structures
      • Section 1. Cable ducting
Chapter 4. Installation of equipment
  • Collection 37. General purpose equipment
    • Department 1. Installation of general purpose equipment
      • Section 1. Vessels and apparatus (without mechanisms)
Chapter 6. Repair and construction work
  • Collection 66. External engineering networks
    • Department 1.Plumbing
      • Section 2. Repair
    • Department 5. Miscellaneous works
  • Collection 69. Other repair and construction work
    • Section 6. Cleaning of building structures
CHANGES
  • Chapter 1. Average estimated prices for materials, products and structures
  • Chapter 2. Estimated prices for the operation of construction machines
  • Chapter 3. Construction work
  • Chapter 4. Installation of equipment
  • Chapter 6. Repair and construction work
  • Chapter 7. Restoration and restoration work on historical and cultural monuments
  • Chapter 10. Estimated cost standards for temporary buildings and structures
  • Chapter 14. Maintenance and repair of municipal equipment
DELETIONS
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1. Construction materials, road materials and for restoration work
  • Section 3. Semi-finished products
  • Section 15. Pumps
Chapter 2. Estimated prices for the operation of construction machines
  • Section 1. Construction machines, mechanisms and tools
Chapter 3. Construction work
  • Collection 26. Thermal insulation work
    • Section 4. Prices, including the cost of basic materials
  • Collection 27. Car roads
    • Section 32. Technical means of organizing road traffic of motor transport
Chapter 6. Repair and construction work
  • Collection 52. Foundations
    • Section 2.Repair

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.


Addendum No. 48 to NB TSN-2001

Order No. MKE-OD/18-16 dated 04/05/2018

Addition No. 48 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect in April 2018, by order No. MKE-OD/18-16 dated 04/05/2018 “On approval and entry into force of the Collection of additions No. 48 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 ".

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.

List of chapters affected by changes:

ADDITIONS
Additions and changes to the general and technical parts of TSN-2001
  • Chapter 1. Average estimated prices for materials, products and structures
  • Chapter 3. Construction work
  • Chapter 4. Installation of equipment
  • Chapter 6. Repair and construction work
  • Chapter 7. Restoration and restoration work on historical and cultural monuments
  • Chapter 10. Estimated cost standards for temporary buildings and structures
  • Chapter 15. Transport costs
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1. Construction materials, road materials and for restoration work
  • Section 3. Semi-finished products
  • Section 5. Reinforced concrete and concrete products
  • Section 7. Metal products
  • Section 12. Pipe blanks, pipes, connecting parts and fastenings to them
  • Section 17. Materials and products for water supply, sewerage and drainage systems
Chapter 2. Estimated prices for the operation of construction machines
  • Section 1. Construction machines, mechanisms and tools
Chapter 3. Construction work
  • Collection 6. Concrete, reinforced concrete monolithic structures
  • Department 4. Construction of monolithic structures of residential and public buildings using various types of adjustable formwork
  • Section 1. Construction of monolithic structures of residential and public buildings with a building height of more than 105 to 150 m
  • Section 2. Other work
  • Collection 8. Brick and block structures
  • Section 1. Construction of foundations, waterproofing
  • Collection 12. Roofs
  • Collection 23. Sewerage - external networks
  • Section 6. Sewer wells
  • Collection 29. Tunnels and subways
  • Department 1. Closed method of work
  • Section 3. Drilling tunnels and workings
Chapter 6. Repair and construction work
  • Collection 66. External engineering networks
  • Department 2. Sewerage
  • Section 2. Repair
  • Department 5. Miscellaneous works
CHANGES
  • Chapter 1. Average estimated prices for materials, products and structures
  • Chapter 2. Estimated prices for the operation of construction machines
  • Chapter 3. Construction work
  • Chapter 4. Installation of equipment
  • Chapter 6. Repair and construction work
  • Chapter 14. Maintenance and repair of municipal equipment
DELETIONS
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1. Construction materials, road materials and for restoration work
  • Section 7. Metal products
Chapter 2. Estimated prices for the operation of construction machines
  • Section 1. Construction machines, mechanisms and tools

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.


Addendum No. 47 to NB TSN-2001

Order No. MKE-OD/18-1 dated January 15, 2018

Addendum No. 47 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect in January 2018, by order No. MKE-OD/18-1 dated January 15, 2018 “On approval and entry into force of the Collection of additions No. 47 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 ".

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.

Addendum No. 46 to NB TSN-2001

Order No. MKE-OD/17-51 dated October 16, 2017

Addition No. 46 to the regulatory framework TSN-2001 was issued and put into effect

The collection of additions was approved and put into effect on October 1, 2017, Order dated October 16, 2017 No. MKE-OD/17-51"On approval and entry into force of the Collection of additions No. 46 to the territorial estimate and regulatory framework for the city of Moscow TSN-2001 and amendments to the order dated August 10, 2017 No. MKE-OD / 17-35."

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.

TSN 2001 – Territorial estimate standards for Moscow

To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.

List of chapters affected by changes:

ADDITIONS
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1.
  • Section 5. Reinforced concrete and concrete products
    • 4. Products for housing and civil construction
    • 6. Products for the construction of tunnels and subways
  • Section 6. Metal constructions
    • 2. Structures made of aluminum alloys
  • Section 7. Hardware
    • 11. Other designs
  • Section 12. Pipe blanks, pipes, connecting parts and fastenings to them
    • 5. Thermoplastic pipes and pipeline parts for them
  • Section 14.
  • Section 17. Materials and products for water supply, sewerage and drainage systems
    • 8. Parts for channels and wells
  • Section 18. Materials and products for heat supply systems
    • 4. Heating devices
  • Section 21. Installation and electrical installation materials and products, electrical structures
    • 5. Electrical installation materials
    • 6. Other instruments and devices
Chapter 2. Estimated prices for the operation of construction machines
  • Section 1. Construction machines, mechanisms and tools
    • 11. Pumps and dewatering installations
Chapter 3. Construction work
  • Collection 5. Piling works, soil consolidation
    • Department 1. Piling works
      • Section 1. Piling work carried out from the ground
  • Collection 8. Brick and block structures
      • Section 2. Brick structures
  • Collection 9. Metal constructions
    • Department 3. Assembly and installation of individual structural elements made of aluminum alloys
      • Section 3. Window and door blocks, stained glass
  • Collection 12. Roofs
  • Collection 27. Car roads
      • Section 4. Underlying and leveling layers of the base
  • Collection 32. Tram rails
Chapter 6. Repair and construction work
  • Collection 69. Other repair and construction work
      • Section 4. Repair of various structures
Regulatory table
    on the application of overhead rates, estimated profits and coefficients taking into account additional costs associated with the performance of work in winter
CHANGES
Chapter 1. Average estimated prices for materials, products and structures
Chapter 2. Estimated prices for the operation of construction machines
Chapter 3. Construction work
Chapter 14. Maintenance and repair of municipal equipment
DELETIONS
Chapter 1. Average estimated prices for materials, products and structures
  • Section 1. Construction, road and restoration materials
    • 1. Construction and road materials
  • Section 5. Reinforced concrete and concrete products
    • 1. General purpose products
    • 3. Products for engineering structures and transport construction
    • 4. Products for housing and civil construction
    • 5. Additions to the estimated prices of reinforced concrete products and structures
  • Section 13. Fittings (for pipelines and water taps)
    • 5. Other pipeline fittings
  • Section 14. Materials and products for communication structures, radio broadcasting and television
    • 1. Equipment for radio broadcasting, television, telephone and clock systems
    • 2. Security and fire alarm equipment and devices
  • Section 23. Cable products
    • 4. Telephone cables
Chapter 2. Estimated prices for the operation of construction machines
  • Section 1. Construction machines, mechanisms and tools
  • Section 2. Relocation of construction machinery and mechanisms
  • Section 3. Relocation of additional sections
Chapter 3. Construction work
  • Collection 13. Protection of building structures and equipment from corrosion
    • Section 8. Application of fire retardant coatings
Additions and changes to the general and technical parts of TSN 2001
Chapter 1. Average estimated prices for materials, products and structures
Chapter 2. Estimated prices for the operation of construction machines
Chapter 3. Construction work
  • Collection 1. Excavation
  • Collection 5. Piling works, soil consolidation
  • Collection 8. Brick and block structures
  • Collection 9. Metal constructions
  • Collection 11. Floors
  • Collection 12. Roofs
  • Collection 13. Protection of building structures and equipment from corrosion
  • Collection 15. Finishing work
  • Collection 27. Car roads
  • Collection 28. Railways
  • Collection 29. Tunnels and subways
  • Collection 30. Bridges and pipes
  • Collection 32. Tram rails
Chapter 4. Installation of equipment
  • Collection 10. Communication equipment
Chapter 5. Collections of prices for commissioning works
  • Collection 10. Collection of aggregated indicators of the cost of commissioning works
Chapter 6. Repair and construction work
  • Collection 62. Painting works "Chapter 12. General instructions for the use of TSN-2001". From the general plan, I would like to highlight that a clear definition of the owner of the SNB TSN-2001 has appeared; for a detailed study, follow the link.

    List of chapters affected by changes:

    ADDITIONS

    • Chapter 1. Average estimated prices for materials, products and structures
      • Section 1. Construction, road and restoration materials
      • Section 3. Semi-finished products
      • Section 7. Metal products
      • Section 21. Installation and electrical installation materials and products, electrical structures
      • Section 22. Fittings, glass and electric lighting devices
      • Section 24. Materials and products for tram and trolleybus contact networks, metal supports for external lighting
    • Chapter 2. Estimated prices for the operation of construction machines
      • Section 1. Construction machines, mechanisms and tools
    • Chapter 3. Construction work
      • Collection 5. Piling works, soil consolidation
      • Collection 13. Protection of building structures and equipment from corrosion
      • Collection 26. Thermal insulation work
      • Collection 29. Tunnels and subways
    • Chapter 4. Installation of equipment
      • Collection 10. Communication equipment
    • Chapter 6. Repair and construction work
      • Collection 66. External engineering networks
    CHANGES
    • Chapter 1. Average estimated prices for materials, products and structures
    • Chapter 2. Estimated prices for the operation of construction machines
    • Chapter 3. Construction work
    • Chapter 4. Installation of equipment
    • Chapter 5. Commissioning work
    • Chapter 6. Repair and construction work
    • Chapter 12. General instructions for the use of TSN-2001
    • Chapter 16. Aggregated construction cost indicators
      • Collection 1. Integrated indicators of the cost of construction of utilities
    DELETIONS
    • Chapter 1. Average estimated prices for materials, products and structures
      • Section 1. Construction materials, road materials and for restoration work
      • Section 3. Semi-finished products
      • Section 19. Materials and products for ventilation and air conditioning systems
    • Chapter 6. Repair and construction work

    Addendum No. 43 to TSN-2001 includes new names of material resources, including:

    • Semi-finished products;
    • Reinforced concrete and concrete products;
    • Hardware;
    • Installation and electrical installation materials and products, electrical structures;
    • Fittings, glass and electric lighting devices;
    • Materials and products for tram and trolleybus contact networks, metal supports for outdoor lighting;

      List of chapters affected by changes:

      ADDITIONS

      • Chapter 1. Average estimated prices for materials, products and structures
        • Section 7. Metal products
      • Chapter 2. Estimated prices for the operation of construction machines
        • Section 1. Construction machines, mechanisms and tools
      • Chapter 3. Construction work
        • Collection 5. Piling works, soil consolidation
        • Collection 27. Highways
      • Chapter 4. Installation of equipment
        • Collection 10. Communication equipment
      Regulatory table for the application of overhead rates, estimated profits and coefficients taking into account additional costs associated with the performance of work in winter.

      CHANGES

      • Chapter 1. Average estimated prices for materials, products and structures
      • Chapter 2. Estimated prices for the operation of construction machines
      • Chapter 3. Construction work
      • Chapter 4. Installation of equipment
      • Chapter 6. Repair and construction work

      Addendum No. 42 to TSN-2001 includes new names of material resources, including:

      • Construction, road materials and materials for restoration and restoration work;
      • Hardware.

      You can download addition No. 42 in the file archive, site menu - > > > TSN-2001 Moscow

      To install, you need to buy a license for the right to use; on this issue, please use the feedback form or call us.


    • Collection 24 - Heat supply and gas pipelines - external networks
    • Collection 29 - Tunnels and subways
    • Collection 32 - Tram tracks
  • Chapter 4 - Installation of equipment
    • Collection 8 - Electrical installations
  • Chapter 6 - Repair and construction work
    • Collection 65 - Internal sanitary work
    • Collection 66 - External engineering networks
  • Chapter 7 - Restoration and restoration work on historical and cultural monuments
    • Collection 8 - Restoration and recreation of plaster finishes

Addendum No. 37 to TSN-2001 includes 203 new items of material resources, including:

  • Powdered bentonite molding clay;
  • Sump tanks made of steel pipes and plate steel;
  • Carbon dioxide (carbon dioxide) liquid;
  • Linden edged boards;
  • Fender boards and handrails with aluminum profiles with corner and end elements;
  • Reinforced concrete products for residential buildings of the DOMNAD, DOMRIK series;
  • Spare parts for installation for trenchless renovation of old pipelines;
  • Protective screens for pipe welding;
  • Fire-resistant armored power cables with copper conductors;
  • Universal alkyd varnish;
  • Sheet copper;
  • Polyethylene shells;
  • Supports are movable (sliding);
  • Bends, transitions, welded steel tees;
  • Polyurethane foam insulation of pipes and fittings for them;
  • Vinyl plates;
  • Self-adhesive plates for autonomous fire extinguishing;
  • Hot-rolled hexagonal steel;
  • Dry two-component lime-cement repair mixtures;
  • Fiberglass liner pipes;
  • Pig iron;
  • Wooden furniture dowels;
  • Reinforced concrete sleepers for tram tracks;
  • Track and inter-track electrical connections for tram tracks.
  • Moscow City Committee on pricing policy in construction and state examination of projects, by order MKE-OD/19-30 dated April 29, 2019,

    Approved and put into effect:
    Determined that:


    Annex 1

    Adjustment factors to the estimated prices of Chapter 15 “Transport costs” TSN-2001.15 to determine the estimated cost of transporting water-saturated soil obtained as a result of excavation work, not used for backfilling, outside the construction site to collection facilities.


    Appendix 2

    Correction factors for determining in design documentation the amount to be placed at collection sites for water-saturated soil (in tons) to the natural volume.

To determine the cost of construction of facilities in the city of Moscow, Territorial Estimate Standards for Moscow at the basic price level as of January 1, 2000 (TSN-2001) have been developed and used.

Drawing up estimates using TSN‑2001 for Moscow has a number of features:

    The cost of work is determined according to the relevant standards and prices of TSN-2001 with the accrual of overhead costs and estimated profits, additional costs associated with the performance of work in winter, in the established amounts and manner. The rates of additional costs associated with the complication of work in winter (winter price increases) are calculated by type of work in the form of coefficients for labor costs, wages, machine operation, cost of materials and are “linked” in the regulatory framework to prices, i.e. are taken into account in local estimates in position. separate calculation of overhead costs and estimated profits from workers' salaries and drivers' salaries. The NR and SP standards for driver salaries are the same for all rates. Current standards NR, SP, ZU are provided along with conversion indices to the current price level. When preparing estimate documentation for repair and construction work, overhead costs and estimated profit are accrued in the amounts established for repair work (reducing factors are not used as when working with TER and FER , with the TSN database, separate standards for repair work are provided). The pricing code differs from that adopted in FER (TER). The code contains the chapter code (type of normative collection). There is no need to add a prefix to quotes. Materials not included in the prices do not have an estimate code (price tag code), they only have an OKP code, which is not unique. Local estimates are compiled using special forms at basic, current or two price levels.

To take into account the peculiarities of determining the estimated cost using TSN‑2001 in Moscow, the local estimate provides the attribute “TSN Methodology”. If this feature is set, then an additional tab “Calculation using the TSN method” is displayed on the local estimate form, where the parameters for applying winter price increase coefficients are set.

In the positions of the local estimate “according to the TSN method”, instead of the “Innovation and joint venture” tab, the “Innovation, joint venture, charge” tab is displayed with the corresponding standards, which can be edited if necessary.

According to the TSN methodology, separate calculation of overhead costs and estimated profit from the basic salary (wages of construction workers) and the salaries of machine operators (machinists) is accepted. Norms NR and SP are loaded from the external regulatory database TSN when inserting items into the estimate. The standards for overhead costs and estimated profit from the salaries of machine operators for calculating amounts at the basic and current levels are conditionally constant values ​​and are stored in general settings.